End of line testing is a containment step
Introduction
End of line testing is a containment step. It finds the bad part after the process has produced it, and every cost attached to that part has already been incurred by the time the test fails it. A corporate group investing in more end of line capability is buying better containment and reading it as prevention.
The test is necessary. Nothing here argues for less of it. The argument is about what a test can and cannot do to cost of poor quality, and where the money spent on catching parts would do more if it were spent on catching the process.
What follows is what a test catches, which costs are already spent when it fails a part, why more test capacity reads as prevention, where prevention sits, and how to weigh the two investments.
What does end of line testing actually catch?
A part that is already bad, made by a process that has been wrong for as long as it took to reach the test.
An end of line test measures the finished part against a specification. Pass or fail. It is the last point in the plant where a defect can be stopped before it ships, and it does that job well. What it cannot do is say when the process started producing that part, how many parts came before it, or what changed.
By the time a test fails a part, the process has already made every part between the moment it drifted and the moment the test caught up. The test catches the consequence. The cause has been running the whole time.
Which costs have already been incurred when the test fails a part?
All of them except warranty, and warranty is the one the test exists to prevent.
Take the five components of cost of poor quality. Scrap: the failed part is scrap the moment it fails, and so is every earlier part that failed for the same reason. Rework: the parts that can be saved still have to be reworked, at labor and capacity the plant had committed to something else. Containment: everything made since the last good test result is now suspect and gets held. Sorting: the held stock has to be gone through. Four of the five are spent before anyone knows why.
The test prevents the fifth. A part that fails at end of line does not reach the customer. That is real and it is the test’s whole value. It is also the reason the test reads as prevention: it prevents the escape, and the escape is the cost the customer sees, so the test looks like the thing that protects cost of poor quality when it protects one component of it.
Why does more test capacity read as prevention?
Because a better test catches more defects, and catching more defects looks like having fewer of them.
A corporate operations review sees escapes fall after a test investment and reads the fall as quality improving. The plant is producing the same number of bad parts. It is catching a larger share of them. Scrap goes up, containment goes up, rework goes up, and warranty goes down, and the review is watching warranty.
The investment did what it was bought to do. It moved cost from the customer’s side of the line to the plant’s side. It removed none of it, because the process that made the parts was never touched.
Where does prevention sit, if the test is containment?
In the process signals, before the part exists, at the point where the drift that will produce the bad part is already visible.
A process rarely fails in one cycle. Torque, temperature, pressure and cycle time move before a part goes out of specification, and they move in the plant’s own data, which the plant already records and mostly does not read. The bad part the test will catch later is visible in the signals now, as a pattern that looks different from the pattern that made good parts.
Prevention is acting on that pattern before the part is made. It is a different job from testing, done by different people with different data, and of the two jobs it is the one that changes how many bad parts exist.
How should a corporate operations team weigh a test investment against a process investment?
By asking which of the five components each investment moves, and in which direction.
A test investment moves warranty down and moves scrap, containment, sorting and rework up or leaves them alone, because it catches more of the same parts. A process investment moves all five down, because it reduces the number of bad parts made. The test investment is the right one when escapes are the problem and the process cannot yet be seen. The process investment is the right one everywhere else, and it gets deferred because it does not have a machine attached to it.
So the question to put to a test proposal is what it will do to the four costs the test does not touch. It will catch more; that part is not in doubt.
What should a corporate operations team do next?
Take the last test investment and write down what happened to scrap, containment, sorting and rework in the months after it, beside what happened to warranty.
Acerta LinePulse reads the process signals a plant already produces, catches multi-signal drift before a part goes out of specification, and reports it as the metrics the plant runs on, so prevention happens in the process and the test goes back to being the last check instead of the point of discovery. To see how it works for corporate manufacturing and operations teams, read LinePulse for corporate manufacturing and operations.